Tuesday 7 May 2013

Still Playing Tunnel Ball. . .

 Dave has been busy with the grinder again, cutting back the metalwork around the tail-shaft to make plenty of room for the twin system that needs to ride up inside the tunnel as well. . .
 This is the top of the diff poking its head through the floor and having a look around in the rear of the wagon. Dave has to make up and install a special 'hat' to keep this nosey bugger outside where it belongs. . .
This is where we left off yesterday and Dave was applying the finishing touches to the rear transmission mount. It's hard to get good detail with the camera in and around these tight spots, but as usual, Daves work is spot on and now the transmission can be dropped at the rear with the special three piece mount . . .

No comments:

Post a Comment